
New TopShim run:

version = topshim 4.4.0
date = 2026-10-05
time = 14:01:11.825
command = topshim 1d optsolvent coil=1H optsolvent tuneaoff hrmas

HRMAS SHIMMING

Parameters:

probe = Z180004_0001
angle PHI = 270.5 degree
solvent = H2O+D2O
shim nucleus = 1H
nucleus optimised for = 1H
o1p (from lock) = 4.70 ppm

Results:

Iteration 1: FWHM Before= 1.0 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration 2: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration 3: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 9.6 Hz
Iteration 4: FWHM Before= 9.6 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration 5: FWHM Before= 0.5 Hz, Target= 0.5 Hz, After= 0.4 Hz
Using the best result as the final shim state.

Lineshape quality factor (1D spectrum, MAS) = 3.27


Unusually slow convergence behaviour detected during shimming.
This may be indicative of an incorrect mounting angle being used!
1. Please perform 'topshim calreset'
2. Restart topshim
3. Enter the correct value for the mounting angle


MAS shims:
Z'	-15417
Z2'	+90241
Z3'	-43878
Z4'	+0


duration = 1 min 53 sec
completed successfully
finished Mon Oct  5 14:03:04 2026


========================================================================
